BOS 200® Achieves No Further Action at Washington State UST Site

Summary

Trap & Treat® BOS 200® was used to remediate petroleum hydrocarbon impacted groundwater in shallow overburdened soil at a former retail gasoline site in Washington State. BOS 200® was surgically injected to successfully achieve the site cleanup goals. A No Further Action was issued in August 2017.

Challenges

The site is a retail service station and convenience store. A release was discovered at the site in 1988 associated with the underground storage tank (UST) systems. Gasoline-range hydrocarbons were detected in soil exceeding the Model Toxic Control Act (MTCA) Method A Cleanup Levels (CULs) from nine (9) to 27 feet below land surface. Soils on site have been identified as coarse-grained sands and gravels.

Approach

  • Based upon historical analytical data, depths between 12 and 27 feet BLS were selectively targeted for treatment.
  • The selected technology for the remedial action was Trap & Treat® BOS 200®. Four (4) areas of residual impact received a total of 34 injection points on 7.5-foot triangular-grid spacing. The second round of in-situ BOS 200® injections was conducted near MW-9 on January 12, 2015. The second injection event specified an additional 10 injection points installed in the targeted area. The site met the requirements of Groundwater Model Remedies No. 5 and was issued a No Further Action in August 2017.
  • 4,195 lbs BOS 200®, 2,150 lbs gypsum, 15 gallons of bacteria concentrate were

Results

Gasoline-range hydrocarbons were reduced by ~77% immediately following the initial injection. After a single sampling event spike in total petroleum hydrocarbons-gasoline range organics (TPH-GRO), concentrations then dropped to a historic low (~92% drop). A second injection was conducted near MW9, dissolved concentrations of gasoline-range hydrocarbons and other volatile organic compounds (VOC) remained below Method A CULs for four (4) consecutive quarters of groundwater monitoring post-injection.

Project Snapshot

Location
  • Centralia, Washington
Client
  • Washington State
Solution
  • Data analysis/design (fall 2013)
  • Initial Injection of BOS-200® (April 2014) 2nd Injection of BOS-200® – (January 2015)
  • No Further Action – Washington DOE August 2017
Treatment Areas (total)
  • 1,145 sq. ft.
Depth to groundwater
  • 8 to 19 ft. below land surface (BLS)

Ready to Clean Up Your Site?

We’ve helped stakeholders across the world achieve cleanup goals faster, safer, and more cost-effectively — and we can do the same for you.

Let’s talk through your site and see if in-situ remediation is a fit.

Newsletter Sign-up

Receive information about remediation techniques, AST's activities and more...
Cleaning up the world,
one site at a time

Headquarters

Copyright © 2025 AST Environmental, Inc. all rights reserved.